Done list

After some summers, Akka has seen a number of changes and improvements. Here is a list of the main changes. Obviously, there have also been lots of little fixes and changes that have not made it onto this list 🙂

Done list

                  

  • 2014
    • Installed septic tank
    • Fixed gas bottles
    • Installed depth sounder
    • Replaced all sea-vlaves
    • Battery-boxes
    • Electric and manual bilge-pump
    • Installed fuel filter
  • 2015
    • Electric cabinet and partial re-wiring
    • New oven
    • Installed DSC-VHF
    • Installed EPIRB
  • 2016
    • New sails
    • Installed a new hatch in the head
    • New guard wires
    • New 56 meter Ankarolina anchor-band
  • 2017
    • New winches
    • New plotter
    • Replaced toilet
  • 2018
    • Started with re-cabling
    • New mast cables
    • More wooden floor boards
    • replace engine mounting pads
  • 2019
    • New fenders
    • Gas leak sensors
    • more floor boards
    • new kicker pulley
  • 2020 Corona
  • 2021
    • New waste valve
    • New pekken
  • 2022
    • Ceiling covering
    • Deck organiser
  • 2023
    • Anchor chain plus windlass
    • Cockpit grating
    • Autopilot
    • Speed, wind and depth instruments
    • New stairs
    • New engine cooling inlet valve
    • Storage cupboard
    • Additional solar panel

 

Comments are closed.